www.viniti.ru Всероссийский Институт Научной и Технической Информации
 

База данных PEIS-V больше не обновляется с 1 июня 2018г.

The PEIS-V database is no longer updated from June 1, 2018


Physics Electronic Information Service by VINITI

PEIS-V | Help

Оценка остаточного ресурса подсистем СУЗ реактора РБМК-1000 первого блока Смоленской АЭС

Соколов С.В.

Изв. вузов. Ядер. энерг., vol: 2009, num: 3, 37-43, 225-226, published: 05 April 2009,


   Nuclear reactor physics.
      Reactor and reactor installation dynamics. Control and direction.
         Controls and protection (theory, calculation, experiment).

   Nuclear reactor physics.
      Reactor and reactor installation dynamics. Control and direction.
         Monitoring and measuring apparatus. Control and direction system equipment.

   Nuclear reactor physics.
      Reactor and reactor installation dynamics. Control and direction.
         Stability analysis.

   Nuclear reactor physics.
      Nuclear power. Reliability and safety problems. Engineering problems.
         General problems.
            Economics of nuclear energy.