www.viniti.ru Всероссийский Институт Научной и Технической Информации
 

База данных PEIS-V больше не обновляется с 1 июня 2018г.

The PEIS-V database is no longer updated from June 1, 2018


Physics Electronic Information Service by VINITI

PEIS-V | Help

Stepwise Approach for the Determination of the Need of Personnel at the Unterweser Nuclear Power Plant

K. Ramler, A. Auffarth, H.-M. Trinh, B. Vollmüller

atw, vol: 57, num: 11, 656-658, published: 01 November 2012,


   Nuclear reactor physics.
      Nuclear power. Reliability and safety problems. Engineering problems.
         Fuel cycle.
            Radioactive wastes, their processing and disposal. Transportation and storage of nuclear fuel and radioactive materials.

   Nuclear reactor physics.
      Nuclear power. Reliability and safety problems. Engineering problems.
         General problems.
            Training of personnel. Education.

   Nuclear reactor physics.
      Nuclear power. Reliability and safety problems. Engineering problems.
         Operation of reactors and reactor installations. Manoeuvring regimes. Starting of installations. Decomissioning and conservation of installations. Equipment decontamination and maintenance.

Link